1/4

CITRA RAYA MALL

Project Title :
 
Year :
Location :
Site Area :

Mall Ciputra

@ Citra Raya

Detail Engineering

Design

2016

Tangerang

4,5 Ha

Located in Cikupa, Tangerang, this 45,000 sqm land area will consist of three phases, which are as follows: mall, mall expansion, and apartment. Citra Raya Mall is phase one in this three-phase project. The three-phase project is a mixed-use development which will also cover a residential area and a hotel.

 

Owned by the Ciputra Group, AIM was one of the several consultants involved in this three-phase project. As the architectural consultant, AIM’s responsibility is to justify the initial concept that was done by DP Architects, with details in the Detailed Engineering Design (DED) stage. Moreover, this project required AIM to collaborate with the other consultants involved. Additionally, AIM will also supervise the progress during the construction of the mall, in regards to the DED.

 

This 7-story mall houses various facilities such as: cinema, supermarket, F&B thematic restaurants and tenants, game zone, and fitness center.

Designed and rendered by DPA

© 2018 by Alami Inter Media

AIM | Alami Inter Media

enhancing business by design

Jl. Johar 9

Bandung 40114

+622 22 2053 3003